WATER HAMMER IN STEEL TRUNK WATER CONDUITS AND PROTECTION MEASURES (CASE OF THE KAMPIRRAVAT – FERGANA SYSTEM)
Keywords:
Water hammer, wave celerity, steel pipe, valve closure time, relief valve, expansion joint.Abstract
Water hammer is analysed in the steel gravity conduit (Kurgantepa – Fergana, 1020×9 mm) and the pumped conduits (Fergana – Pakana and Fergana – Kirguli, 820×8 mm) of the Kampirravat – Fergana water transfer system. The pressure wave celerity is calculated with Joukowsky's formula and compared for different pipe materials. In steel pipes the celerity is 980–1006 m/s, 2.4–2.5 times higher than in glass-fibre reinforced plastic pipes. Rapid valve closure on the Kurgantepa – Fergana conduit raises the pressure by 175 m to a maximum of 336 m, i.e. 1.9 times the allowable value of the pipe. The minimum permissible valve closure times are determined for each section (42–119 s), and 200–240 s is recommended in practice. The filling regime of the conduit and the number of air valves are determined. Protection devices for the pumping stations and temperature compensators for above-ground sections are justified. Steel and GRP pipes are compared in terms of surge head, allowable pressure and resistance to vacuum.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.